I had a plumber run conduit, water, and gas to an outbuilding last December. I'm just now getting around to running the electrical. I noticed that he used sched 40 conduit. I keep reading about using sched 80 once the conduit comes above ground.
Is this a probelm? Do I need to get this guy back to fix this?
Is this a probelm? Do I need to get this guy back to fix this?