Well-known member
I am close to pouring the slab for my new shop. I plan to use mhf and run it through
1 1/2 inch conduit. When shopping for the schedule 80 I can find the 180 but all the straight is schedule 40. Where am I required to have schedule 80. Do I need it underground or just in the Slab? Can I use schedule 40 in the wall to the load center.
Help appreciated.