I have a couple of problems with the epoxies-one is the prep work needed to make sure the paint sticks and two-the fact that I have to drag equipment in when I'm done. I suspect that I could spends days epoxing the floors only to destroy everything when I move my lathe, mill two steel fab tables and sandblast cabinents into the shop. The finishers did a crappy job on my floors and a solid color paint will just highlight their work, too. Suggestions?