I'm looking to run 100A to my garage/shop. Mainly to supply power to a Miller 211 welder, but also to begin to finish the garage - and to do so, I want a dedicated sub panel there.
I have 4/0 running about 140' from the transformer to my main service panel, which is 200A.
From the main service panel, I have 2-2-2-4 SE-R feeding a 100A sub panel in the middle of my basement. From there, I have I think 30A 10g running to the garage, which is roughly 70'.
I was wondering what you guys thought would be the best way to go about doing this?
1. Run the 100A line directly from the main panel to the garage?
2. Run the 100A line off the sub panel in the basement?
Also, what do you guys think would be sufficient for wire size ( I know this depends on the run, but given the above distances)?
Here is a diagram of what I'm dealing with in RED, and what I'm looking to do in BLUE.
Thanks for any help/advice/suggestions!!
John
I have 4/0 running about 140' from the transformer to my main service panel, which is 200A.
From the main service panel, I have 2-2-2-4 SE-R feeding a 100A sub panel in the middle of my basement. From there, I have I think 30A 10g running to the garage, which is roughly 70'.
I was wondering what you guys thought would be the best way to go about doing this?
1. Run the 100A line directly from the main panel to the garage?
2. Run the 100A line off the sub panel in the basement?
Also, what do you guys think would be sufficient for wire size ( I know this depends on the run, but given the above distances)?
Here is a diagram of what I'm dealing with in RED, and what I'm looking to do in BLUE.
Thanks for any help/advice/suggestions!!