NS Gearhead
Member
- Joined
- Jan 29, 2022
- Messages
- 19
He guys! I'm just about to put roofing and siding on my new garage... but as it's not weather tight yet, I have noticed that the back 1/3 of the garage seems to hold water pretty bad, as well as another couple of spots. So, as I plan to seal up the expansion joints, surface grind, then epoxy, should I level off those areas first? How well does that stuff hold up compared to the original concrete? It's going to be a general use garage with a emphasis on auto storage/ maintenance and metal fabrication/ welding/ machining.
