600SL
Well-known member
Hello everyone.
I just purchased a piece of property to build my new House/Man cave on. The property is 2.5 acres of which about 1.5 acres is usable. I would like to put the septic field in a area not useful for anything else. So I am thinking the bottom left corner of the property. That is a wooded area that would need to be cleared and perk tested. It would also require about 400-500 ft of pipe just to get to the septic field or tank. As shown by the picture below that left lower section is over 200ft long. Could the septic field be one 200' length of pipe or possibly double back a bit to get up to 400'. Putting a septic field in this area a feasible concept.

I just purchased a piece of property to build my new House/Man cave on. The property is 2.5 acres of which about 1.5 acres is usable. I would like to put the septic field in a area not useful for anything else. So I am thinking the bottom left corner of the property. That is a wooded area that would need to be cleared and perk tested. It would also require about 400-500 ft of pipe just to get to the septic field or tank. As shown by the picture below that left lower section is over 200ft long. Could the septic field be one 200' length of pipe or possibly double back a bit to get up to 400'. Putting a septic field in this area a feasible concept.

