Hello,
I've read a bunch of posts on this topic, but haven't seen a lot of answers on what to use for the wire transition.
I want to run SER AL 2-2-2-4 in my basement to an outside junction box, then switch to MHF AL 2-2-2-4. To make the transition inside the junction box (plastic 12x12x6) I want to use Marathon 1414300, 4 pole, 2-14awg terminal block. The block is rated at 115V, 600A.
Just wanted to verify this is an acceptable way to transition for a 100Amp service?
Also seems to be very economical, ~$25.
Thanks
I've read a bunch of posts on this topic, but haven't seen a lot of answers on what to use for the wire transition.
I want to run SER AL 2-2-2-4 in my basement to an outside junction box, then switch to MHF AL 2-2-2-4. To make the transition inside the junction box (plastic 12x12x6) I want to use Marathon 1414300, 4 pole, 2-14awg terminal block. The block is rated at 115V, 600A.
Just wanted to verify this is an acceptable way to transition for a 100Amp service?
Also seems to be very economical, ~$25.
Thanks
Last edited: