Firetacoma
Well-known member
- Joined
- Sep 13, 2009
- Messages
- 65
The house that we're closing on a week from Friday has a severely sinking floor... the end closest to the house has sunk down about 6" totally messing up the drainage. Would it be cheaper to rip up the entire floor, compact the soil and repour a new slab or mudjack it? Can it be mudjacked up that far?
The slab itself is in good shape... no cracks at all. The house is about 40 years old.
The slab itself is in good shape... no cracks at all. The house is about 40 years old.
