Sewer line under new garage slab

[email protected]

New member
Joined
Jun 2, 2014
Messages
1
I am adding a 1 car garage attached to my existing garage. I have a PVC sewer line about 1 foot underground with 2 clean outs about 4 feet apart right where I want to pour my new slab. I live in Michigan which requires 42 inch deep footings. Can I pour over this line?
 
To avoid these ads, REGISTER NOW!

ffjosh

Well-known member
Joined
Oct 6, 2011
Messages
475
Location
IN
Maybe im misunderstanding but isnt the sewer line in the way of the footing?
 
To avoid these ads, REGISTER NOW!

Ron Lombardo

Well-known member
Joined
Feb 20, 2006
Messages
393
Location
New York
That would be acceptable 12" of cover ... just extend the Clean outs up to finished floor and install 2 cleanout deck plates ... they come in nickel bronze or epoxy covers and you can access them thru screws ... in case you need to snake out the waste line.
 