2fst4u_7
Well-known member
Had my first framing inspection and failed because my engineering calls for all shear walls to be blocked at panel edge to satisfy nailing pattern. The walls are 14.5' tall so there is two sheets to reach top. So my question is how do I block the walls at the panel edge now that the walls are up? The only thing I can come with with is to nail one end of block through the stud and noe nail the other end and repeat. Or stagger them but then I wouldn't be hitting both panels or is that not an issue?
Thanks for any help
Thanks for any help
Attachments
Last edited:
