Hello there,
Been lurking for a long time whilst the shed and backyard slowly progressed.
Bought a 1930 bungalow about 4 years ago and took 2 years to renovate the house from top to bottom.
Started on the backyard about a year ago. First job was demolishing the rotten old shed and a bit of backyard clean up. Shed is going to be 14m x 7m. Walls are 3m and tip of the ridge is 5m.
Backyard with old shed demolished.
Access to the backyard is a bit of an issue.
Old pathway to end of backyard.
Preparing base for shed / garage.
Neighbours shed.
Pad finished for concrete.
Been lurking for a long time whilst the shed and backyard slowly progressed.
Bought a 1930 bungalow about 4 years ago and took 2 years to renovate the house from top to bottom.
Started on the backyard about a year ago. First job was demolishing the rotten old shed and a bit of backyard clean up. Shed is going to be 14m x 7m. Walls are 3m and tip of the ridge is 5m.
Backyard with old shed demolished.
Access to the backyard is a bit of an issue.
Old pathway to end of backyard.
Preparing base for shed / garage.
Neighbours shed.
Pad finished for concrete.
Last edited: