To avoid these ads, REGISTER NOW!

Shed Siding - how far to extend beyond bottom plate?

grissom

Well-known member
Joined
Apr 27, 2012
Messages
280
Location
Northern California
I was going to build the shed myself but keep running into lack of available time to complete it

So now I am contemplating having Tuff Shed build it using my existing foundation / floor

Tuff Shed has said that the siding extends 1.00 inch below their bottom plate which would only mean a 1/4 inch past my floor. I am a bit concerned that that is not enough to protect my floor from potential water issues

Thoughts?

IMG_6593[1].PNG
 
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!
Top Bottom