I assisted on a Fujitsu 24k dual mini installation with a 15 and a 9 kbtu evap for a friend the other day. It is his work shop and her ceramic studio. We roughed in the line sets and I strongly cautioned him to watch the rockers. In their discussion with him they said, "oh yeah, we do these all the time." That was a great comfort to the owner as he is a retired union carpenter from the city and has hung mtns of rock. All four lines were kinked. Apparently the guy who knew about being careful around the line sets was on another job that day. "What do we do?" "Well, if you had put plywood up in here we would remove a few screws and be in there, do the repair and button it back up and finish, but because you were sentimental about sheetrock (how can anyone be sentimental about sheetrock?), watch this... The repair was affected and the system went in four days later but I had the red *** all day over it. I still have the red *** over it
I know that is my problem but I contrast this with my experience in my shop. When I needed into the wall to run the solar wiring it took me a max of 15 minutes to remove the plywood wall from floor to ceiling. The work was done and it took less than 10 minutes to put the wall back together. It's a shop not the living room. They are tickled pink with the mini-split.



