Azarius
Well-known member
Hey folks!
Looking to shingle my garage on Saturday...
Currently I just have the 2x6 wood sub-fascia on the truss ends... I want to use aluminum fascia with it. The roof is currently sheathed, but nothing more. I have the drip edging ready to go...
Do I have to install the aluminum fascia FIRST, then the drip edge over it? Or can I install the roofing first, then come back and do the drip edge. Anyone have any familiarity in this subject?
Thanks!
Looking to shingle my garage on Saturday...
Currently I just have the 2x6 wood sub-fascia on the truss ends... I want to use aluminum fascia with it. The roof is currently sheathed, but nothing more. I have the drip edging ready to go...
Do I have to install the aluminum fascia FIRST, then the drip edge over it? Or can I install the roofing first, then come back and do the drip edge. Anyone have any familiarity in this subject?
Thanks!
