Finally get around to pouring an apron in front of the shop. Just finished forming and steel today and now we have a bunch of rain headed our way. Tentatively planning on pouring on the 29th.
1800 sq. ft, 5-1/2" thick (+/-), #3 rebar 18" O.C., 3500 PSI. A buddy of mine helped me get the grade, forms, & steel down. The neighbor's cousin (who my buddy found through his contacts) lives down the road and is putting the crew together. And ironically, his niece used to help us in our vineyard when she was in H.S. Small world...
1800 sq. ft, 5-1/2" thick (+/-), #3 rebar 18" O.C., 3500 PSI. A buddy of mine helped me get the grade, forms, & steel down. The neighbor's cousin (who my buddy found through his contacts) lives down the road and is putting the crew together. And ironically, his niece used to help us in our vineyard when she was in H.S. Small world...