Hey all,
You guys have been great giving advise for my 30x40 shop I'm planning out. Now I got a few more questions. I'm planning on a 30x40x12 2x6 framed shop. I I live out in the county and have reached out to the county and wasn't given any specifics on what I'm building. The guy helping build the shop suggests our footer 1'x1' should be strong enough and the slab will be poured at the same time which as of now is 4in with an x brace that I assume goes from the corners of the footing. I do want to plan to add a lift later as money allows. Does any of this not make sense? There is a bit of a slope so we are gonna have to bring in full to bring the shop above the flow of water and bring the low side up. So far that is about 70 yards I am tracking. After the fill is spread/compacted the footer would be dug or framed out. I appreciate your feedback on all of this.
You guys have been great giving advise for my 30x40 shop I'm planning out. Now I got a few more questions. I'm planning on a 30x40x12 2x6 framed shop. I I live out in the county and have reached out to the county and wasn't given any specifics on what I'm building. The guy helping build the shop suggests our footer 1'x1' should be strong enough and the slab will be poured at the same time which as of now is 4in with an x brace that I assume goes from the corners of the footing. I do want to plan to add a lift later as money allows. Does any of this not make sense? There is a bit of a slope so we are gonna have to bring in full to bring the shop above the flow of water and bring the low side up. So far that is about 70 yards I am tracking. After the fill is spread/compacted the footer would be dug or framed out. I appreciate your feedback on all of this.