I just had a 18x40 slab poured for garage yesterday. They knew I was adding a lift so they cut 1 control cut down the middle long ways and also 1 down middle short ways. They did it cause the cut would have been at 10ft and lift is going at 12ft. I am kinda wondering if I should have had them go ahead and cut that 10 and 30ft long ways.
What you guys think ???