Wiz02
Well-known member
I had a toilet flange leak that caused buckling of the hardwood floor. The area is mostly covered by the toilet (see picl).
I am waiting for the floor to finish drying and I do have access to the subfloor as this is above the basement.
I did relieve the area around the toilet flange where a board was hitting it on the left side.
Should I just install a new seal, put in some screws from the bottom or remove a board?

I am waiting for the floor to finish drying and I do have access to the subfloor as this is above the basement.
I did relieve the area around the toilet flange where a board was hitting it on the left side.
Should I just install a new seal, put in some screws from the bottom or remove a board?