just thinking in my 30x50 shop that is open and everything ran in EMT...
I have one side done and am dreading doing the other side.... would this be a situation to install a subpanel on the other side of shop...? I am extremely novice about electric but am assuming that this option may be beneficial , save me time and money...
If so, what size..., and what materials would be required...
Thanks in advance to anyone for their input