Tried to search for an answer but couldn't find my particular situation. So the crew that did the block foundation put j bolts in the block. A different crew is there framing now and I noticed they cut those bolts flush and used a wedge anchor (redhead) . The reason was because the guys that did the block put them too far in. The question is, is this acceptable? It will be getting inspected but I can't seem to find any information about it besides reading that they shouldn't be used in block, but I assume that means unfilled block. Walls are just about up and trusses should be the next day or two so I'm a little nervous