deafanddiabetic
Member
- Joined
- Feb 19, 2016
- Messages
- 6
Simple question that hopefully has a simple answer.
I'm burying in #6AWG 18 inches deep in 1/2" PVC conduit about 80 feet to my garage.
Is that one wire all I need? I know the idea of leaving more room for power later, but my specific question is, do I need 3 different #6 wires pulled through (one for ground, one for neutral, one for hot), or is that ONE wire all I need and the electrician will split it into three braids to wire into the subpanel he's installing the garage? He said if I dug and run the conduit and wire it'd save me a ton of money. He listened to my garage electrical usage needs and recommended the #6 specifically.
So, one #6 wire for the garage, or does it need 3 wires to work correctly?
I'm burying in #6AWG 18 inches deep in 1/2" PVC conduit about 80 feet to my garage.
Is that one wire all I need? I know the idea of leaving more room for power later, but my specific question is, do I need 3 different #6 wires pulled through (one for ground, one for neutral, one for hot), or is that ONE wire all I need and the electrician will split it into three braids to wire into the subpanel he's installing the garage? He said if I dug and run the conduit and wire it'd save me a ton of money. He listened to my garage electrical usage needs and recommended the #6 specifically.
So, one #6 wire for the garage, or does it need 3 wires to work correctly?