I'm about to start building a 30x48 pole barn nect month and before i start the site prep, I want to make sure I have the right plan to go by. I live in northeast north Carolina, and where I want to build it nice and flat/level already. From my research I need to dig up all the top soil and organic material, replace with fill dirt and compact as filling in. Then set my poles and build then add 4in of clean 57 stone then concrete. Sound about right? thanks
