Hello
I’m looking for some others opinions on site prep. I locked in with a builder for a 36 x 48 pole barn. I’m working on getting quotes for the site prep. I’m in upstate NY, I’ve had a couple of people stop in about the site prep and they recommended waiting until spring.
Does the wetness of the ground/winter cause issues with compacting stone?
In the paperwork my builder gave they state the site should be built up 8”. With the slope of my lawn, the lowest corner would require around 24” of fill. Is it necessary to for the fill to be 8” above the highest area? Obviously I want to ensure water doesn’t flow into the garage, 8” just seemed like it may be more than necessary.
Around the 8” fill question, do they mean 8” of fill plus concrete on top? I’m planning on 5” of concrete. Didn’t know if the 8” included concrete or not.
Thanks for the info
Sent from my iPhone using Garage Journal
I’m looking for some others opinions on site prep. I locked in with a builder for a 36 x 48 pole barn. I’m working on getting quotes for the site prep. I’m in upstate NY, I’ve had a couple of people stop in about the site prep and they recommended waiting until spring.
Does the wetness of the ground/winter cause issues with compacting stone?
In the paperwork my builder gave they state the site should be built up 8”. With the slope of my lawn, the lowest corner would require around 24” of fill. Is it necessary to for the fill to be 8” above the highest area? Obviously I want to ensure water doesn’t flow into the garage, 8” just seemed like it may be more than necessary.
Around the 8” fill question, do they mean 8” of fill plus concrete on top? I’m planning on 5” of concrete. Didn’t know if the 8” included concrete or not.
Thanks for the info
Sent from my iPhone using Garage Journal