To avoid these ads, REGISTER NOW!

Skirt Board question

Rickster1966

New member
Joined
Jun 27, 2019
Messages
3
Location
South dakota
Hello All. My first time posting. So here's my question. I'm adding a shop with a concrete floor to my existing pole barn outside one corner, like an addition. However, past the floor of the new part along one length I'll be pouring will be a concrete apron, almost like a patio, which will be poured at the same time. The patio slab will be about 2"-3" lower than the steel building's floor. My question is, how do I handle the Skirt board along the bottom? I'm laying the posts and slab prior to putting up the walls and I'll be using the skirt board as the form for the cement pour, which will be great for the other 2 new sides, but not so easy on the side with the patio thing.

I don't imagine it would be advisable to use the skirt board as the form where the patio slab will be right? In other words, this would sandwich the skirt board between the patio and the building floor. As I said, the skirt board would still stick up about 2-3 inches so I can attach the vertical steel to it, but it just doesn't seem right. Or would it be better for me to pour both slabs at the correct height and then just attach the skirt board later.

Sorry about this rambling post but didn't know how else to describe it. Any help would be appreciated. Thanks.
 
To avoid these ads, REGISTER NOW!

Leaflessshadetree

Well-known member
Joined
Aug 1, 2013
Messages
7,214
Location
Don't ask.
I'll be using the skirt board as the form for the cement pour, which will be great for the other 2 new sides, but not so easy on the side with the patio thing.

I don't imagine it would be advisable to use the skirt board as the form where the patio slab will be right?

Why not?
If suppose if you wanted to you could put some expansion joint on the outside of the skirt board on that side.
 
To avoid these ads, REGISTER NOW!

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
51,592
Location
Northern Central Ohio
I'm not 100% sure of what you're doing, pictures always help when asking a question.

If I was adding on to the building/shop for a work area, I'd pull the skirt board off and use something like a foam expansion joint. See link below. It has a perforated edge that can be peeled off after the concrete is poured and then filled with something like Sikaflex for a nice transition. This concrete, I would want level with each other, no step up/down.

The patio area, I'd probably do similar but I'd want it slightly lower to avoid any intrusion of rain water or melting snow. Putting those two surfaces on the same plane is nothing more than asking for trouble, now or in the future.


https://www.menards.com/main/buildi...59-c-5642.htm?tid=-194308544997418365&ipos=22
 
To avoid these ads, REGISTER NOW!
Top Bottom