New to the site and love it. I am just starting to save for the slab will probably go with a steel building already talked to code inforsment and they said I could do a 30 x40. my question is does any one have advice on the slab? I will be puting a floor rack and an old frontend lift in the garadge also would like to put a few I beams across the shop to run a troly with a chain fall. any advice and pics of setups like I want is appreciated.
 
To avoid these ads, REGISTER NOW!

queenbee

Active member
Joined
Nov 13, 2011
Messages
26
Location
Oxford, NY
Need just a little more info, how high of a celling and what will be the largest thing that you'll put in there. Just remember that if your installing radiant heat that you need atleast 2 more inches of form, so a 6 inch slab would need 8 inches, 2 inches for the foam.
 
To avoid these ads, REGISTER NOW!

49tandc

Well-known member
Joined
Sep 15, 2005
Messages
381
Location
Gainesville Florida
Decide where your electrical panel will be. Lay some PVC chases - front to back BEFORE the slab is poured. Stub them up & cap them off. Use them for wiring/water/cat5, etc. Its SO much easier to snake them through the floor rather than up & across the ceiling. If you can get away with a drain, consider putting in a drain - makes wash-up very easy.

49T&C
 
OP
P

popeye31

Member
Joined
Nov 21, 2011
Messages
24
Location
Louisiana
Im down south in Louisiana, Kenner to be exact about 13 miles west of New Orleans. so it doesn't get to cold around here no need for foam. or insulation. The biggest thing I will probably put in my garadge is my dads 2500 dully. The heaviest thing will be an old frontend alingment lift. And I want to say the code inforcment guy said it could only be 12 foot from ground to peak.
 