Does anyone have any input on how much error you can have when it comes to leveling the forms for a slab? Right now, I have about a half inch height difference in my forms from corner to corner. Is 1/2 inch too much for level? It is 26'X40'. Thanks!
All my concrete people claim they can level a slab to within 1/4" of level, but the reality after a rain reveals the truth, I'm lucky to get 3/8" deep puddles. Since some of my projects need a level floor to make fabrication a little easier, the flatter the better, when possible. A bad floor never gets better with time.
