Have had my 30x64 built for 2 years now. Finally realized I'm not going to get around to doing the floor on my own, so I'm contracting it out to a local concrete contractor. They don't do radiant though - they leave that up to either a plumber, or owner.
I'm going to have a 6" slab with fiber. Not planning on any rebar or mesh.
My thought for insulation is 2" Formular250 vertical from top of slab down 2 feet on all 4 sides. Then either Crete-Heat or Amvic Ampex under the slab, depending on what I can get for a decent price. Leaning toward Crete-Heat. I know it's not as cheap as tieing to mesh, but my back and my time is worth the cash.
Then use Radiantec for all my plumbing needs.
Thoughts?
I'm going to have a 6" slab with fiber. Not planning on any rebar or mesh.
My thought for insulation is 2" Formular250 vertical from top of slab down 2 feet on all 4 sides. Then either Crete-Heat or Amvic Ampex under the slab, depending on what I can get for a decent price. Leaning toward Crete-Heat. I know it's not as cheap as tieing to mesh, but my back and my time is worth the cash.
Then use Radiantec for all my plumbing needs.
Thoughts?