Slab is being poured today.
They said we could start work inside in a few days. But thinking I should seal the slab before it gets stained with various construction stuff.
How long do I need to wait to seal and any prep needed?
Thought about moving the materials for interior walls and such inside. Would protect from rain but have some tarps so thinking it might be better to leave outside out of the way. Building is 30 x 40 so could put some things inside away from the walls and still have room for finishing up the inside. Put it in or leave it out?
Inside sheeting? Thinking T111 or sheeting I can hang stuff from - maybe OSB or plywood. For the ceiling do the same thing or drywall? I will be insulating - probably blown in for walls and ceiling.
So many choices...
How long do I need to wait to seal and any prep needed?
Thought about moving the materials for interior walls and such inside. Would protect from rain but have some tarps so thinking it might be better to leave outside out of the way. Building is 30 x 40 so could put some things inside away from the walls and still have room for finishing up the inside. Put it in or leave it out?
Inside sheeting? Thinking T111 or sheeting I can hang stuff from - maybe OSB or plywood. For the ceiling do the same thing or drywall? I will be insulating - probably blown in for walls and ceiling.
So many choices...