Hello, long time reader, first time posting here. Really appreciate all the great information here. I have a question which has probably been discussed already but I can't seem to find anything specific to my situation.
I'm building a 32x56 pole barn, planning to pour a 4" slab. Southern Missouri - heavy clay soil. I prepped the site well and scraped it all down to virgin soil. It was pretty dry at that time. I framed it up, spread my gravel base (from about 10" to 2" thickness, as the grade was low on one side) and then had to go out of town for a month. During that month, it's rained like crazy.
So I have it pretty well ready for concrete, but now the clay subsoil is completely saturated with water. Is that going to be an issue if I pour the slab now and then the clay shrinks as it dries out? If so, how long do I need to wait for it to dry out?
Thoughts? Thank you!
I'm building a 32x56 pole barn, planning to pour a 4" slab. Southern Missouri - heavy clay soil. I prepped the site well and scraped it all down to virgin soil. It was pretty dry at that time. I framed it up, spread my gravel base (from about 10" to 2" thickness, as the grade was low on one side) and then had to go out of town for a month. During that month, it's rained like crazy.
So I have it pretty well ready for concrete, but now the clay subsoil is completely saturated with water. Is that going to be an issue if I pour the slab now and then the clay shrinks as it dries out? If so, how long do I need to wait for it to dry out?
Thoughts? Thank you!