Hi all,
So we are revisiting doing a screen porch off the back of the house. I have some questions about the septic line that runs underneath the current patio.
Right now we have a paver patio that I would pull up and reuse somewhere else and do a stamped concrete pad.
This new slab would be over the main line from the house to the septic tank. So I am wondering if that is ok - or should I - before a pad is poured - replace it? or sleeve it or something? My nightmare is having an issue with the line and having to redo the concrete...
I have attached some pics of the current patio and where the line runs. I don't think it is too deep and once I pull the pavers, I have a one time opportunity to do something. What do you all think?
Thanks!
So we are revisiting doing a screen porch off the back of the house. I have some questions about the septic line that runs underneath the current patio.
Right now we have a paver patio that I would pull up and reuse somewhere else and do a stamped concrete pad.
This new slab would be over the main line from the house to the septic tank. So I am wondering if that is ok - or should I - before a pad is poured - replace it? or sleeve it or something? My nightmare is having an issue with the line and having to redo the concrete...
I have attached some pics of the current patio and where the line runs. I don't think it is too deep and once I pull the pavers, I have a one time opportunity to do something. What do you all think?
Thanks!