I'm trying to figure out how to transition from my slab, which has a 10" thick edge and 2" of rigid pink insulation vertically on it, to an apron (to be poured) out front of it. I live in northern wisonsin, lots of frost heave. My other garage slab heaves about 2". I'm thinking one good way would be to pour the apron about 12" from the existing slab, and fill this gap with gravel/rock. Once this is done, place a 1/2" thick aluminum plate 16" wide, and as long as the garag door is wide over the gap, with a little mechanism to keep it in position.... Plase post whatever pics you have or can take of this area! Thanks a bunch!