Kevin54
MEMBER EMERITUS
Before they ever pour the floor, if you are going to have slope to it, what the concrete guys do around here is snap a line on the foundation and drive a few pins in to hold grade.
What you may want to do, and I forgot to tell the guy that did mine, is to make the corners a little higher and slope the floor from the corners to the door. By that I mean that you will have slope back to from, but you also need a slight slope from the side to go towards the door. If they don't, I can almost guarantee water will run to the corners instead of out the door. Also, if you are going to have control joints cut in, have them cut in a way that water will stay between the door opening and not run to the front foundation.
What you may want to do, and I forgot to tell the guy that did mine, is to make the corners a little higher and slope the floor from the corners to the door. By that I mean that you will have slope back to from, but you also need a slight slope from the side to go towards the door. If they don't, I can almost guarantee water will run to the corners instead of out the door. Also, if you are going to have control joints cut in, have them cut in a way that water will stay between the door opening and not run to the front foundation.