Well, the work has finally started on the installation of our snow-melt system. We're using the Norwegian Nexans cables custom ordered from Orbit Mfg in PA. The melt-way path is 75'x8'. The cabling is laid out in rows spaced 4" on center. The biggest headache was getting the required 50-amp GFEP circuit breakers. A BIG THANKS to fellow GJ'r MRB for helping us to get these custom-ordered from Murray. They arrived yesterday and we're expecting to have the system installation completed by early next week and the top layer of asphalt put on as soon as everything checks out.