We are updating our site to go along with some information we are receiving form the manufacturer.
This is their guidelines...... I would be really careful before starting a large project in high humidity or walking on a floor that was coated 2 hours ago to put a second coat on.....
My take on it is humidity should be in the 70's and 4-6 hours, sometimes 8. Ultimately they and I will tell you the same thing. The best thing you can do is re-coat that floor as soon as you can touch it with a gloved hand and not have any transfer.
- Maximum installation humidity levels now 90%
- Recoat time now 2-6 hours
- Maximum recoat time 12 hours
This is their guidelines...... I would be really careful before starting a large project in high humidity or walking on a floor that was coated 2 hours ago to put a second coat on.....
My take on it is humidity should be in the 70's and 4-6 hours, sometimes 8. Ultimately they and I will tell you the same thing. The best thing you can do is re-coat that floor as soon as you can touch it with a gloved hand and not have any transfer.