Burl
Well-known member
I'm ready to install my 1/2" pex tubing, and have a question about the configuration. It will be in a concrete 6" slab, 884 sq.ft., I'm thinking 4 loops, all under 260 ft. either way you do it, around 1 ft/ c-c. I realize in the spiral, if you "lose" a loop you're still partially covered. But I see a lot of back and forth stuff, which seems easier to put down. Any thoughts?