383 240z
Well-known member
I have my power feed to the shop run inside that grey conduit. I'm pretty sure I'm wanting to grade around the shop to help with my water issues. I would be removing about 2-3 ft of earth. The problem in that is my conduit will only be about 10" below grade. I have no problem digging it up and cutting a deeper trench. However I REALLY don't want to buy a new run of cable to feed the shop. Can I splice in the extra length I'll need? It's AL cable if that changes anything. Keith