evilstevie
Member
- Joined
- Mar 13, 2017
- Messages
- 5
So I'm going to be re-arranging my hanging electrical heaters (2 5000 watt units) in the detached garage, and wondering what the best way to go about it is.
Option 1) I have a few different lengths of 10/2 wire that I could splice together, using wire nuts and junction boxes, to get the wire to length to reach the new heater locations. This will be above my currently open garage ceiling. I think my only limitation here is that the junction boxes need to be accessible, so when I do finish off the ceiling the boxes needs to be right there at the ceiling drywall, with a dummy plate on top. There will need to be two splices.
Option 2) Just spend the money and buy the length of 10/2 that I need, and not use the smaller lengths at all. I don't want to run into an issue down the road because I wanted to save $50. It seems safer to not have any splices, but maybe I'm worried about nothing.
Curious what people's thoughts are.
Thanks
Option 1) I have a few different lengths of 10/2 wire that I could splice together, using wire nuts and junction boxes, to get the wire to length to reach the new heater locations. This will be above my currently open garage ceiling. I think my only limitation here is that the junction boxes need to be accessible, so when I do finish off the ceiling the boxes needs to be right there at the ceiling drywall, with a dummy plate on top. There will need to be two splices.
Option 2) Just spend the money and buy the length of 10/2 that I need, and not use the smaller lengths at all. I don't want to run into an issue down the road because I wanted to save $50. It seems safer to not have any splices, but maybe I'm worried about nothing.
Curious what people's thoughts are.
Thanks