I'm replacing a rusted out trailer floor, originally constructed with square and rectangular tubing. Crossmembers are 2x2x.180" 28 inch centers. 6 feet long
I have a good pile of tiny galvanized I beams 1.75x1.875x.25" taken from a fencing demolition job.
What issues do I need to consider in deciding if this is a good or bad idea to save about $300 by reusing these i beams?
I have a good pile of tiny galvanized I beams 1.75x1.875x.25" taken from a fencing demolition job.
What issues do I need to consider in deciding if this is a good or bad idea to save about $300 by reusing these i beams?
