Making s l o w progress on my Morton Building. The framing is finished for the office, mini-kitchen, and bathroom. Electrical is being completed now. When I ordered the building I added two options (among others). I increased the roof pitch to 6/12 and had one truss deleted so I could use space above the planned office space.
Here are some pictures. I did not want the stairs inside the office as that would require the stairs be fully built in and insulated as office will be conditioned space. Note upper stair landing is cantileverd as I did not want the office wall hard against the garage bay door. The building is 30 x 40 and the office etc area is ~12 x 30. BTW any overhead lights in pictures are temporary.
I plan to heat and cool the office with a mini-split. The building has basic insulation to prevent condensation, but it would not be adequate so the stud walls will be insulated as well.
Cheers,
Selo
Here are some pictures. I did not want the stairs inside the office as that would require the stairs be fully built in and insulated as office will be conditioned space. Note upper stair landing is cantileverd as I did not want the office wall hard against the garage bay door. The building is 30 x 40 and the office etc area is ~12 x 30. BTW any overhead lights in pictures are temporary.
I plan to heat and cool the office with a mini-split. The building has basic insulation to prevent condensation, but it would not be adequate so the stud walls will be insulated as well.
Cheers,
Selo
Attachments
-
IMG_20171219_111106313.jpg112 KB · Views: 62 -
IMG_20171219_111143318.jpg112 KB · Views: 59 -
IMG_20171219_111019835.jpg130.8 KB · Views: 57 -
IMG_20171220_084242591_HDR.jpg136.8 KB · Views: 60 -
IMG_20171224_162531016.jpg124.9 KB · Views: 67 -
IMG_20171227_202721928.jpg119.2 KB · Views: 75 -
IMG_20171224_162555493_HDR.jpg54.5 KB · Views: 81