OK, tomorrow's the day. I actually started this project several weeks ago having bought my kits from Lowe's (drove 1.5 hr. each way to Louisville). I'm coating a new construction floor which has had nothing on it other than builders feet and boxes since it was poured back in June. I did a moisture test and also did the test that consists of sprinkling water on the floor and watching absorption. Both worked well. I washed and rinsed the floor then etched it with the soulution provided in the kits. I followed up with baking soda to neutralize the acid, then rinsed completely. The expansion joints were filled with a latex caulk. All of this was over a month ago.
When I was ready to coat on the Labor Day weekend, the weather turned extremely hot (close to 100) and it started raining resulting in a near 100% humidity. So I postponed.
After lengthy business travel, I spent the day today sweeping the floor with a shop vac, then lightly wet mopping. The floor now looks like this:
I've read the posts about non-curing floors with great trepidation but am confident that I can do this by watching the mixtures closely. Incidentally, I asked my professional paint contractor for a quote. This contractor has applied epoxy floors before and refused to give me a quote. He said that he's had these go bad before and was not willing to take the risk of having to eat the cost if it doesn't work. Therefore, I'm going to give it a shot. I'm already invested in this to the tune of three regular kits and three clear-coat kits. I'm gonna make this work.
So, I'll try to take some pictures and will post some updates as the work progresses. If all goes well, I should have a floor curing no later than Wednesday. We'll see.
When I was ready to coat on the Labor Day weekend, the weather turned extremely hot (close to 100) and it started raining resulting in a near 100% humidity. So I postponed.
After lengthy business travel, I spent the day today sweeping the floor with a shop vac, then lightly wet mopping. The floor now looks like this:
I've read the posts about non-curing floors with great trepidation but am confident that I can do this by watching the mixtures closely. Incidentally, I asked my professional paint contractor for a quote. This contractor has applied epoxy floors before and refused to give me a quote. He said that he's had these go bad before and was not willing to take the risk of having to eat the cost if it doesn't work. Therefore, I'm going to give it a shot. I'm already invested in this to the tune of three regular kits and three clear-coat kits. I'm gonna make this work.
So, I'll try to take some pictures and will post some updates as the work progresses. If all goes well, I should have a floor curing no later than Wednesday. We'll see.