I'm planning to use steel for my ceiling in my new 36x32 garage
Trusses are 2ft o.c. and going 32ft length.
How long of panels should I get for my steel? I'd imagine a 36ft piece will be hard to manage.
Also should I start at the front or back with my steel when I start?
Trusses are 2ft o.c. and going 32ft length.
How long of panels should I get for my steel? I'd imagine a 36ft piece will be hard to manage.
Also should I start at the front or back with my steel when I start?
