Hi,
I live in central MN, with a typical temperature swing most years around the range of -30 at the worst to 105 at the max.
I’m in the process of looking for a concrete contractor to pour my slab for my new 24x32 garage.
The big question; should I insist on monolithic or stem wall construction?
The land that it will be going on is virgin dirt, no trees within 20 feet of any side of where the garage will be. I want something that will last. Heaving is a large issue in MN, and there’s codes specifically designed to combat it, but the question of monolithic or stem wall is typically up to the contractor.
Which should I insist on, and what’s typically the difference in cost? (I’m aware that stem wall has higher labor costs)
I live in central MN, with a typical temperature swing most years around the range of -30 at the worst to 105 at the max.
I’m in the process of looking for a concrete contractor to pour my slab for my new 24x32 garage.
The big question; should I insist on monolithic or stem wall construction?
The land that it will be going on is virgin dirt, no trees within 20 feet of any side of where the garage will be. I want something that will last. Heaving is a large issue in MN, and there’s codes specifically designed to combat it, but the question of monolithic or stem wall is typically up to the contractor.