Used 2 x 4s, 1/2" sheeting for loft, using drywall/deck screws to assemble. Used 5/16" lags into every other 16" O.C. studs. Also lagged cleats @ 16" O.C. Ceiling 2 x 4 was lagged @ 24"? O.C. then I dropped a couple of supports where each 8 ft section mated together, with a single support in the middle of each section. Lagged them to the loft and to the ceiling cleat.
The reason for my concern is that I have a couple of spots (approx. 8 ft from each end) where it looks like a small gap (maybe 1/8"?) is occurring between the ceiling cleat and the ceiling. I am getting ready to put about 1000 lbs up there and want to make sure it stays...