Patience is a virtue, or so I've been told...
It all started last year, the street in front of my garage (I live on a corner) heaved up (frost heave). The road department came out and cut a small hole only to find that the road had no foundation! So they tore out the heaved area and put down gravel while they took bids to fix the road.
Well, a little more than a year has passed, and the crew showed up a couple days ago and started tearing out the street. I mean, they tore it completely out, curbs and all. They probably went nearly 2ft down! Needless to say, I can't get into my driveway. I live on the corner, so I can drive through my yard and do a 1000-point maneuver to get into the garage if I need to, but still... I asked one of the workers how long the street should take, and he said "we have another street to do too, so we're going to do them at the same time. I'd say about 3 weeks"...
When I got home from work, one of the guys stopped me and said that my driveway was poured over the street, and to make it connect to the new street properly, they will have to remove and repour the end section. That's actually kinda awesome, because the end of my driveway was getting pretty cracked with age. Plus they have clipped it with their bulldozers and made it worse (and they spray painted markings on it, which initially pissed me off until I heard their plans).
So basically I just wanted to whine that I am locked out of my driveway for 3 weeks, but at least I am getting a free partial driveway out of the deal!
It all started last year, the street in front of my garage (I live on a corner) heaved up (frost heave). The road department came out and cut a small hole only to find that the road had no foundation! So they tore out the heaved area and put down gravel while they took bids to fix the road.
Well, a little more than a year has passed, and the crew showed up a couple days ago and started tearing out the street. I mean, they tore it completely out, curbs and all. They probably went nearly 2ft down! Needless to say, I can't get into my driveway. I live on the corner, so I can drive through my yard and do a 1000-point maneuver to get into the garage if I need to, but still... I asked one of the workers how long the street should take, and he said "we have another street to do too, so we're going to do them at the same time. I'd say about 3 weeks"...
When I got home from work, one of the guys stopped me and said that my driveway was poured over the street, and to make it connect to the new street properly, they will have to remove and repour the end section. That's actually kinda awesome, because the end of my driveway was getting pretty cracked with age. Plus they have clipped it with their bulldozers and made it worse (and they spray painted markings on it, which initially pissed me off until I heard their plans).
So basically I just wanted to whine that I am locked out of my driveway for 3 weeks, but at least I am getting a free partial driveway out of the deal!