VietGnome
Well-known member
Hey all, concrete guy is coming out this week or next and I'm pressed on what to do for plumbing. Not in the books right now but I'm planning on stubbing in for water for a sink.
If I'm planning on the sink in the back should I just have them run all the lines in the slab up to the front of the garage and cap them there at frost line; and I dig them up and tap in later?
Thinking of a 3/4" Pex for water and a 2" drain
If I'm planning on the sink in the back should I just have them run all the lines in the slab up to the front of the garage and cap them there at frost line; and I dig them up and tap in later?
Thinking of a 3/4" Pex for water and a 2" drain
