Utility is droping a 320amp service to our house being built. From our contractor....yet to be installed meter and panel...i will be running a 2-2-2-4 to a well house for a 60 amp sub. Pretty straight forward, and overkill.
Question is for the sub panel going to the workshop. I am wanting to put in a 200amp sub on 4/0 alu due to an apartment, 90 amp requirement for solar, and then for the running of the workshop.
Should I use a pass thru lug for the 200amp Subor is there a better option? I assume I was going to use a 60 amp breaker for the well house. Main panel is siemens.
Gjsparkys are the best!
using Tapatalk....In Renton wa, and i can't change my location from the app......
Question is for the sub panel going to the workshop. I am wanting to put in a 200amp sub on 4/0 alu due to an apartment, 90 amp requirement for solar, and then for the running of the workshop.
Should I use a pass thru lug for the 200amp Subor is there a better option? I assume I was going to use a 60 amp breaker for the well house. Main panel is siemens.
Gjsparkys are the best!
using Tapatalk....In Renton wa, and i can't change my location from the app......