I could use so help with getting electrical to the new garage I am building. Building is a 30 x55 x 14 metal building used for car restoration and wood working. Plans include welder, large a/c , table saw and other fixed tools. I would like to put a 200 amp service out there but realize this may not be possible.
Current electrical is a 200 amp service, The distribution panel is in the garage. The outside panel is an Eaton MBT48B200BTS. There is only one breaker position open in the outside panel so I can't just wire in a sup panel off a new breaker. The spec sheet on this panel says it has a pass through lug. Can I wire the pass though to another "sub-panel" mounted on the house and then run cable to the new shop? Distance is about 100', then have a 200 amp distribution panel in the shop?
I asked the electrician that wired the house and I could not get a straight answer about if this was possible or what other solutions would be. The other electrician that can out to give me a quote, looked at this and said it could be a difficult project but at the same time didn't have a solution or compromise. I would at least like to have some ideas on how this should be done so I can ask intelligent questions of potential contractors.
Thanks
Mike
Current electrical is a 200 amp service, The distribution panel is in the garage. The outside panel is an Eaton MBT48B200BTS. There is only one breaker position open in the outside panel so I can't just wire in a sup panel off a new breaker. The spec sheet on this panel says it has a pass through lug. Can I wire the pass though to another "sub-panel" mounted on the house and then run cable to the new shop? Distance is about 100', then have a 200 amp distribution panel in the shop?
I asked the electrician that wired the house and I could not get a straight answer about if this was possible or what other solutions would be. The other electrician that can out to give me a quote, looked at this and said it could be a difficult project but at the same time didn't have a solution or compromise. I would at least like to have some ideas on how this should be done so I can ask intelligent questions of potential contractors.
Thanks
Mike