Hey guys so I'm trying to get my garage shop build started.I have a question I. Regards to my sub panel,wiring,breakers and so on.
So I had a wire run to where's sub panel is going to be.Wire run was 6/3 however I now believe this is way too small for my needs.
I know that heating and cooling need a 15 breaker max.
I know that the lift in putting in needs a 30amp breaker.
Finally the compressor I am putting in calls for a 60amp double pole breaker.It a 80 gallon compressor.However current draw states max draw is 23amps.So why do I need a 60 amp breaker????Also I know that 2/3 wire is only rated for 50 amps I believe.
So my question is besides those necessities I would have light in the garage but from the main panel and I'll be changing some framing so a lot of the wires need to be relocated as they are on the framing.Can I use existing lighting or should I run the proper wire for 100amp sub panel and be done with this nightmare????
So I had a wire run to where's sub panel is going to be.Wire run was 6/3 however I now believe this is way too small for my needs.
I know that heating and cooling need a 15 breaker max.
I know that the lift in putting in needs a 30amp breaker.
Finally the compressor I am putting in calls for a 60amp double pole breaker.It a 80 gallon compressor.However current draw states max draw is 23amps.So why do I need a 60 amp breaker????Also I know that 2/3 wire is only rated for 50 amps I believe.
So my question is besides those necessities I would have light in the garage but from the main panel and I'll be changing some framing so a lot of the wires need to be relocated as they are on the framing.Can I use existing lighting or should I run the proper wire for 100amp sub panel and be done with this nightmare????