Hi all! When I built my shop I tapped into the meter base to power my shop. I installed a disconnect panel at the meter base and ran 4 wires to the sub panel inside the shop. I had to install a new meter base that does not allow a tap so I am feeding my shop via the house main service panel. My wires from the shop will not reach the service panel so I decided to keep the disconnect panel at the meter and run new wires from the service panel to the disconnect. My thoughts were to run 4 wires to the disconnect panel as I would a sub panel, but the disconnect is not set up that way. It would have to be modified for 4 wires which I am reluctant to do at this time. I need some advice as to how to safely modify the disconnect or can I run 3 wires from the service panel and 4 wires from the disconnect to the garage sub panel. I hope I haven't been too confusing.