I am installing a sub panel in the garage and I was told by someone to run the service wire directly into the rear of the box through a knock out on rear of box so it is clean install. Is this good idea or should it be through top or bottom of box knock outs?
Wire is coming from the house through underground conduit that surfaces at garage on outside wall parallel with wall of garage and then I will put a LB on the conduit and cut hole in block wall with piece of conduit through wall to inside then to the box which is right there.